Methodology / Price basis
Price basis — definition and counting
A quote on one drawing must be broken into nine comparable items. The total on its own means nothing.
- Unit
- RMB / unit
- Formula
- material + machine time + surface finishing + inspection + packaging + tooling amortisation + scrap + overhead + tax
Why suppliers disagree
- Tax inclusive or exclusive: a 13% gap that many quotes leave unstated
- Whether surface finishing is included; anodising and nickel plating are often quoted separately
- Who absorbs material loss: 60% and 85% bar stock utilisation are very different
- Tooling and fixture amortisation: one-off or loaded into unit price
- Payment terms: 60 days is equivalent to a 1% to 2% discount
- Order band: 100, 1,000 and 10,000 units are different businesses
How to collect it on site
- Ask for the original written quote, not a verbal price
- Ask item by item what is included, and write the answer into the contract
- Ask for material grade and supplier; the same grade from different mills prices very differently
- Ask for the price at 100, 1,000 and 10,000 units
The three most common misreadings
- Comparing totals rather than bases; the lowest price is usually the one with the most exclusions
- Extrapolating a batch price from a sample price, often in the wrong direction
- Ignoring inspection cost; full CMM inspection can eat 10% of margin
- Putting tax-exclusive and tax-inclusive prices in the same table
How to use this page: align the basis before you compare. Give the same drawing and the same quantity to three suppliers, ask each to fill in these items, and only then are the totals comparable.